Knowledge

Blogs

Stay up-to-date with us
Documents
Download our materials

Technology

Learn more about our microwave-assisted processing

w

FAQ's

Answer those burning questions
p

OUR TEAM

Get to know our experts

Contact

Reach out to our experts
Frequently Asked Questions

FAQ

How many people are needed to operate a NuWave Research System?

Two (or fewer) people with no technical expertise can operate the system after receiving training from NuWave Research’s team.

I need your service. When can I get started?

Fill out the Contact Form and we will back to you shortly to discuss your project and our microwave equipment.

Is it a batch system?
We have standard batch and continuous systems available. Plus, our machines can be customized to your needs.
What is the through-put of a NuWave Research system?
The through-put depends on a number of factors like the type of product, density, and the desired moisture level of the end product. Our team will be able to analyze your needs based on a few parameters and give you your best options for maximum through-put.
How many hours can the NuWave Research system be operated for continuous processing?

The NuWave Research system can run for up to 24 hours per day. An automated Clean-in-Place (CIP) cleaning cycle is required between runs.

What is meant by odor mitigation?

NuWave Research provides a closed-loop system that captures released vapor and eliminates unpleasant odors. The subtle smells released by RLTD could be more correctly called (low-intensity) fragrances than odors.